Miletenko Na 1

1. Calculation of bolting parameters for coal mine development
2. EVALUATION OF THE STATE OF THE NEAR-CONTOUR MOUNTAIN MASSIF IN JOINT LAVA WITH THE ADJACENT EXCUTTING DEVELOPMENT
3. RESOURCE-REPRODUCING AND RESOURCE-SAVING METAL PRODUCTION WITH A FULL CYCLE OF DEVELOPMENT OF PRIMARY AND SECONDARY GEORESOURCES
4. CREATION OF GRAVIMETRIC MAP AND DEEP STRUCTURE ANALYSIS OF THE TURKISTAN REGION
5. INTEGRATED MONITORING AND MODELING OF SLOPE STABILITY IN STRUCTURALLY COMPLEX ROCK MASS
6. Integrated monitoring-based assessment of deformation and radiation situation of territorial domains
7. PATTERNS OF DEVELOPMENT OF GEOMECHANICAL PROCESSES DURING HYBRID OPEN PIT/UNDERGROUND MINERAL MINING
8. GEOLOGICAL ASPECTS OF URANIUM DEPOSITS FOR IN-SITU LEACHING APPLICATION TO DEVELOP ENERGY POTENTIAL OF KAZAKHSTAN
9. IMPROVEMENT AND SYSTEMATIZATION OF PRINCIPLES AND PROCESS FLOWS IN MINERAL MINING IN THE REPUBLIC OF KAZAKHSTAN
10. INTEGRATED MONITORING OF THE AREA OF ZHILANDY DEPOSITS
1