Khalikova Er 1
1. Monitoring of the stress-strain state during preparatory workings
2. Technological conditions for ensuring the stability of the array of enclosing rocks during the fastening of mine workings
3. Development of technological evaluation criteria for the selection of promising coal methane production sites
1